top of page
Writer's pictureJarrod Suckling

The Escape Pod

A Prefab Modular Housing Concept Aimed At Affordable Living.

These Small 11m2 Units Were Built In A Factory With My Own Structural Design / System And Are Designed To Be Modular. The Buildings Were Delivered To Site Complete & Then Lifted Onto Screw Pile Foundations


Built With 2 Levels Of Finishes To Show Flexiblity In Aesthetic & Costing


Stay Tuned For More Updates


Time Lapse Of The Build Process:



The Build Progress & Finished Product:



Time Lapse Of The On-Site Install:



Stop Digging NZ Screw Pile Foundation Install:










238 views0 comments

Recent Posts

See All

Comments


bottom of page