top of page

Hobsonville Townhouse Bathroom Reno

We needed to remove an existing wall to extend the toilet, remove the existing door and put in a new wall where the door had been removed. All of these alterations meant that the client had a new bathroom on their 2nd level


Comments


bottom of page